Our firm specializes in procuring carbon credits from a diverse array of renewable energy initiatives across Southeast Asia, including solar, wind, and hydroelectric projects. These ventures are verified by authorized certified bodies, ensuring they conform to the highest levels of environmental integrity and sustainability standards. This rigorous verification process guarantees that each project we invest in not only contributes to reducing carbon emissions but also meets global benchmarks for renewable energy practices. Below are some of the projects that we have worked on.

Sao Mai Solar Farm Project

Sao Mai Solar Power Plant is located in Tinh Bien district (An Giang province) and invested by Sao Mai Group with a total capital of nearly 6,000 billion VND, total generating capacity of 210MWp, spread over an area of ​​275 hectares. The project was divided into 2 phases, phase 1 of the factory was COD before June 30, 2020.

Phase 2 of Sao Mai solar power plant with a total capacity of 106MWp was officially connected to the national power grid and put into commercial operation on December 15, 2020.

Ham Kiem 1 Solar Farm Project

A solar farm project in Vietnam.

Ham Kiem Solar Power Plant Project is a model of a large-scale grid-connected solar power plant built according to the build-own-operate method. The project is built in Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province.

Ham Kiem solar power plant project with a capacity of 15MW (phase 1), the plant contributes more than 10 million kWh annually, contributing to overcoming the electricity shortage in the region and the whole country, ensuring energy sources. quality for the socio-economic development of the province and the region.

 

Trung Nam Thuan Nam Solar Power Plant

The project is implemented by Trungnam Group with a total investment of VND 12,000 billion, the implementation scale includes a 450MW solar power plant combined with a 220/500kV substation and more than 17km of dual-circuit 500kV transmission lines, 04 220kV transmission lines. .
 
Particularly, the 500/220kV substation is invested in this period with 2 transformers with a total capacity of 1800MVA, 4 compartments of 500kV, 20 compartments of 220kV, a system of line resistance of 500kV-220kV-33kV and a system of 39 cabinets. GIS medium voltage 33kV. At the same time, the project scope also invests in expanding 02 500kV lanes at the 500kV Vinh Tan substation.

Thuan Nam Duc Long Solar Power Plant

With a design capacity of 50MWp, the Thuan Nam Duc Long solar power project was quickly completed, officially energizing at the end of 2019. This is a project funded by DLG Ninh Thuan Solar Power Joint Stock Company (under the Company). Duc Long Gia Lai Group Joint Stock Company) is the investor. The project was invested and built in Phuoc Minh commune, Thuan Nam district, Ninh Thuan province with a total investment of over 1,000 billion VND.

The project began construction in mid-September 2019, within just 3.5 months the project was completed, energized on December 30, 2019, connecting the 220KV line. This project is part of the 2,000 MW solar power design capacity of Ninh Thuan province that has been approved by the Prime Minister for implementation.

Dong Hai 1 Wind Power

Dong Hai 1 Off-shore Wind Power Project (OWPP) is developed in Duyen Hai district, Tra Vinh province with a capacity of 100 MW, average generation of 330 GWh/year. The project was invested by Trung Nam Tra Vinh 1 company with a total investment of 5,000 billion VND. The project includes 25 wind towers at the sea positions V1-7.

IAPet Dak Doa 1 & 2 Wind Power Plant Project

The factory was located in La Pet commune, Dak Doa district, Gia Lai province. The investor of the project is the Energy Resources Technology Group – TRE. The IAPet Dak Doa Wind Power Plant Project launched construction in March 2021. The factory was officially launched and placed into service on January 14, 2022. The plant’s overall capacity is around 200 MW. The project is split into two factories, each with a capacity of 100 MW. 

Trung Nam Phuoc Huu Wind Power Project

Wind Power Project No. 5 with total investment capital of 1,633 billion VND, total capacity of 46.2 MW, scale of 11 pillars, expected exploitation output of 136,281 MWh/year directly connected to National power grid system with 220kV voltage level through 220kV transmission line connecting from 220kV transformer station of Ninh Thuan wind power plant No. 5 to Ninh Phuoc 220kV transformer station.

Huong Dien Hydropower Project

The 81 MW Hydropower Project in Thua Thien Hue, Vietnam is located in the Huong Van Commune, Huong Tra, Thua Thien Hue. The project has collectively installed and now operates with an annual estimated power generation of more than 250,000 megawatt hours.

Dong Nai 2 Hydropower Project

Dong Nai 2 Hydropower Project is invested by Trungnam Power, a subsidiary of Trungnam Group, with the installed capacity of 75 MW, investment capital of 2500 billion VND, located in the commune Tan Thuong, Di Linh district, Lam Dong province. Dong Nai 2 Hydropower Plant is built on Da Dang River.